Pressure relief valve leaking
Fire Hydrant System
· How It Works
From the documents you already receive, aedile reads, understands and connects the information behind each building, turning scattered paperwork into a living record.
Records in any format - PDFs, Word documents, images, spreadsheets, emailed records and folders - enter aedile. aedile reads them and returns structured information: building address, fire system, service date, next due date, contractor and any defect identified.
01
Upload existing fire safety records from any contractor, in the formats you already use, or simply email them to aedile.
02
aedile identifies the information that matters while retaining the original source document.
Extracted information
Reading…Contractor
Apex Fire Services
Building
14 Rivergate Plaza, Brisbane QLD
Installation
Fire Indicator Panel
Service date
12 Jun 2026
Next due date
12 Dec 2026
Defect identified
Zone 3 detector - replacement required
6 fields extracted · original retained · unclear fields flagged for review
03
Each detail is connected to the right building, system, history and requirement.
Installation
Fire Indicator Panel
Service record
Serviced 12 Jun 2026
Apex Fire Services
Contractor
Apex Fire Services
Service history
12 Jun 2026 · 14 Dec 2025
12 Jun 2025
Obligation
Test 6-monthly
Next due 12 Dec 2026
Evidence
Service report · Certificate
Staff Training
4 / 5 staff current
Next refresh 10 Aug 2026
Defect
Zone 3 detector
Identified 12 Jun 2026
Start your 30-day free trial for one building.
Start Your 30-Day Trial04
Dates, defects, missing evidence, training and outstanding actions remain visible as the building changes.
Record posture
At Risk
1 critical defect on file. 3 open items.
Open items 3
Pressure relief valve leaking
Fire Hydrant System
Missing discharge test record
Fire Hydrant System
Annual evacuation practice overdue
Staff Training
05
When aedile finds a missing record or an open defect, it drafts the follow-up to your contractor. You approve it. When the contractor replies, the new record is filed against the right building and system, and the open item updates.
Prefer it hands-off? Set any follow-up to Send Automatically and aedile sends it for you, then logs exactly what went out. Or have it simply notify you and make the call yourself.
By default, nothing is sent to a contractor until you approve it.
Issue surfaced
aedile identifies a problem or a missing record.
Follow-up sent
By default, the request for evidence goes to your contractor only once you approve it.
Record received
The contractor replies and the record is captured automatically.
History updated
The record is updated and the full history stays connected.
06
Generate the records and supporting history you need without rebuilding the story from folders, inboxes and contractor portals. When the inspector asks, produce the Inspection Pack: the original records, maintenance history and open items, organised by system.
Attention
3 items require attention to keep your fire safety record complete.
Review 3 items →
Scheduled Services
14
On a regular schedule
Action Needed
3
Needs review
Overdue
0
All current
Documents
38
2 to check
16 June23 June30 June6 JulyToday
Your 30-Day Free Trial Is Coming Soon.
Cancel anytime before your first charge